$45 Million Highway 169 Bridge Project Begins Monday - NewsOn6.com - Tulsa, OK - News, Weather, Video and Sports - KOTV.com |

News

$45 Million Highway 169 Bridge Project Begins Monday

Posted: Updated:
There are no equipment or crews out yet, but all along US 169 from 56th North to 66th North, attached to the speed limit signs are reminders that fines are double when road crews are out. There are no equipment or crews out yet, but all along US 169 from 56th North to 66th North, attached to the speed limit signs are reminders that fines are double when road crews are out.
OWASSO, Oklahoma -

There is no equipment or crews out yet, but all along US 169 from 56th North to 66th North, attached to the speed limit signs are reminders that fines are double when road crews are around.

 The sound of passing cars along US 169 in Owasso is a constant, often accompanied with the bang of cars hitting damaged spots in the road.

"It's in pretty bad shape, going north and south. It doesn't seem to hold up traffic really but it is in really bad shape," driver Josh Ascol said.

If all goes as planned, the torn up places will be made new as ODOT crews span out to begin a major road expansion and construction project.

"I'm very excited they are taking the initiative," driver Robert Ramirez said.

The $45 million dollar project will cover about a miles worth of road, starting at 56th Street to 66th Street.

ODOT says under the project crews will expand the current four way roads to six, and replace eight bridges along the corridor: two 56th Street North, two bridges over Bird Creek.

Two over the bird creek over flow and two over the north bird creek overflow.

“This definitely, for Owasso's side, this is gonna be a huge step and probably should be one of the priority ones,” Ramirez said.

He says the potholes and overall damage is a problem.

Ramirez said with a lot of the work planned to be done at night, it can get dark out there, and hopes extra lights are added to keep drivers’ and workers’ safe.

"Safety concerns pray for everybody out there and that everybody is taken care of and with get this up and running as quick as possible," Ramirez said.

ODOT said the majority of the work is scheduled to be done in the overnight hours during the week and on weekends to have a minimum impact on traffic. The project is estimated to be completed by the spring of 2017.

Special Features

Live Traffic

Get the latest road conditions on Green Country roadways.

iPhone App

Get breaking news, weather, sports & video directly on your iPhone.

CBS Shows

Watch your favorite CBS shows for free online.

Links

Looking for a website or event you heard mentioned on News On 6? Find it here!

TV Schedule

Need to know what's on TV? Check out our television schedule.

Live Radar

WARN Interactive

Special Coverage

  • Bridge Tracker

    How safe are Oklahoma's bridges? Use Bridge Tracker to find out now.

  • Fallen Heroes

    News On 6 honors our fallen Oklahoma heroes. View our interactive timeline.

  • Murrah Bombing Timeline

    Learn more about the events leading up to and following the bombing.

  • Storm Zone

    Watch tornadoes tear across Oklahoma and learn how to stay safe!

Powered by Frankly
News On 6
303 N. Boston Ave.
Tulsa, OK 74103
Newson6.com is proud to provide Oklahomans with timely and relevant news and information, sharing the stories, pictures and loves of Oklahomans across our great state.
All content © Copyright 2000 - 2018 KOTV. Oklahoma Traveler™ is a registered trademark of Griffin Communications. All Rights Reserved.
For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices.