Street improvement areas which will affect Tulsa traffic include<br><br>"OPEN: EAST 36TH STREET SOUTH, YALE AVENUE TO HARVARD AVENUE<br><br>61ST STREET AND UNION AVENUE: 61ST STREET IS CLOSED BETWEEN
Monday, October 30th 2000, 12:00 am
By: News On 6
Street improvement areas which will affect Tulsa traffic include
"OPEN: EAST 36TH STREET SOUTH, YALE AVENUE TO HARVARD AVENUE
61ST STREET AND UNION AVENUE: 61ST STREET IS CLOSED BETWEEN UNION AVENUE AND U.S. HIGHWAY 75 FOR 7 TO 10 DAYS. This is part of the project to widen the intersection to four lanes in each direction, including right- and left-turn lanes
NORTH PEORIA AVENUE, APACHE STREET TO E. 27TH PLACE NORTH: Traffic is narrowed to two lanes for at least one month. Southwestern Bell is continuing its duct work.
Utility relocations (Delays should be expected). SOUTH 129TH EAST AVENUE EAST 21ST STREET TO EAST 31ST STREET.
LEWIS AVENUE, THIRD STREET TO PINE STREET: Traffic has bee narrowed to tow lanes for street reltabilitation. Delays should be expected for 10 to 14days.
15TH STREET. FROM CINCINNATI PLACE TO PEORIA AVENUE: Traffic is narrowed to two lanes for street resurfacing. Delays should be expected.
EAST 21ST STREET. HARVARD AVENUE TO LEWIS AVENUE: Construction is continuing. Traffic is narrowed to two lanes for 30 to 60 days.
FOURTH PLACE. 73RD EAST AVENUE TO MEMORIAL DRIVE. Construction has begun for street rehabilitation. Delavs should be expected.
THIRD STREET, UTICA AVENUE TO LEWIS AVENUE: Traffic has been narrowed totwo lanes for four to five weeks during street resurfacing.
THIRD STREET AND MAIN STREET: The south two lanes are closed for strom sewer installation in connection with the Main Street mall project.
GILCREASE MUSEUM ROAD AND EDISON STREET: Traffic has been narrowed to two lanes for approximately 30 days during reconstruction of the intersection.
SOUTH GARNETT ROAD, 41ST STREET TO 51ST STREET: Construction has begun on water- and store-sewer lines for this project to widen Garnett to five lanes (four with a center turn lane). Traffic has been detoured to the east side of the road. Delays should be expected for six to seven months.
41ST STREET OVER THE BROKEN ARROW EXPRESSWAY is closed for construction of a new bridge. Through traffic is blocked on 41st Street between Memorial Drive and Mingo Road. A detour is available.
SOUTH 87TH EAST AVENUE is closed just south of 41st Street for two to four weeks during construction of a concrete box storm sewer and relocation of a water line.
SHERIDAN ROAD. 71ST STREET TO 81ST STREET: The road is being widened to five lanes (four and a center turn lane). Delays should be expected.
Get The Daily Update!
Be among the first to get breaking news, weather, and general news updates from News on 6 delivered right to your inbox!