Memorial at BA Expressway reopened after Friday night bridge collapse


Monday, May 13th 2002, 12:00 am
By: News On 6


Traffic is flowing freely at the site where a Tulsa bridge collapsed on Friday evening.

Construction crews closed off the area Friday night to demolish the Broken Arrow Expressway bridge over Memorial. A portion of the bridge prematurely collapsed when a crane came crashed through to the roadway below.

No one was hurt.